Joe Martin Ditch Improvements

The improvements along Joe Martin Ditch will be broken down into segments.  This project includes regrading, installation of storm sewer pipe, and slope paving within the Joe Martin Ditch right-of-way from Mary’s Creek to Sleepy Hollow Dr.  Substantial erosion and siltation of the existing ditch is preventing the adjacent Woodcreek Subdivision storm sewer system from properly draining causing the system to retain excessive stormwater.

Pre-Construction

Construction In Progress

Verified by ExactMetrics