McHard Rd. Detention Pond

This project is part of a collaborative effort with the City of Pearland

This detention facility is designed as a regional mitigation basin strictly for the benefit of the watershed with no availability to be sold or allocated for public of private projects as part of a joint project with the City of Pearland.  This area was identified in the Master Drainage Plan and the specific property was found to be available during the design process of the McHard Rd. Extension project.  It is approximately 35 acres and the volume will be maximized to provide ultimate benefits to the surrounding community.

Pre-Construction

In Progress

Completed

Cowart/Bailey Pond Weir Improvement Project

This project has been completed

The District has identified the need for improvements to the weir structures at the Bailey Detention Pond (south of Bailey; west of Wells Dr.) and the Cowart Diversion Detention Pond (between Veterans Dr. and Wells Dr.).
A drainage study of the Hood Ditch area was completed in August 2017 which identified several projects that would reduce flooding along Hood Ditch. The improvements at the Diversion Pond were included in this study and was used as a guide to scope this project.
The proposed optimization of the existing weir to Bailey Pond has also been identified by observations during rain events and the LOMR for Coward Creek Diversion improvements. These improvements will provide efficient use of the available volume in both ponds and will reduce the flooding risk to residents along the north/south streets between Bailey and CR 100.

Westminister Ditch

This project has been completed

Westminister (BBQ) Ditch is an existing drainage channel located just north of the intersection of FM 518 & Pearland Parkway.  The ditch is a grass-lined channel that drains east before discharging into Clear Creek.

The purpose of this project is to shift the ditch within District owned Right of Way in order to provide sufficient maintenance access on both sides of the channel.  The District will also rehabilitate and re-establish the slope of this ditch as well as replace failing outfalls.

Pre & During Construction

Completed

Country Place Ditch

This project has been completed

Brazoria Drainage District No. 4 is scheduled to begin drainage reclamation and maintenance activities on the Country Place, The Lakes at Country Place, and Southdown drainage ditch in July 2019.

Project scope shall include, but is not limited to, Drainage Right of Way reclamation, outfall repairs, and maintenance of the drainage ditch adjacent to Country Place, The Lakes at Country Place, and Southdown subdivisions.

The initial phase of the project shall include drainage easement reclamation work consisting of the removal of trees, debris, and any encroachments upon the Drainage Right of Way. The Drainage Right of Way has been located by a professional land surveyor. The Drainage Right of Way will be cleared of any encroachment including structures, fence, plantings, and any other obstructions to the operation and maintenance of the drainage facility.

The drainage channel known as Country Place/Southdown Ditch extends from State Highway 288 east, then turning north to outfall into Clear Creek.  The neighborhoods to the north and south of this ditch began construction in the early 1980s.  The outfall pipes from those neighborhoods have needed repairs or replacement for several years.  This project will first address those failing outfall pipes and structures from Country Place and Southdown, then will refocus to regrading of the channel.

Government Ditch

This project has been completed

This is an inter-local project with Brazoria County to clean out and improve approximately 2.3 miles of a drainage ditch extending from FM 1462 in Rosharon, south to County Road 655 on the Ramsey and Jester state farm property.  This ditch is located in an area that does not currently have Drainage District representation.

Springfield Ditch

This project has been completed

Springfield Ditch & Park Village Detention Pond

The detention facilities for the neighborhoods of Springfield and Park Village have been plagued with drainage difficulties for many years.  In an effort to more effectively drain these facilities, the District engineered and has nearly completed a project that combined the two detention ponds with the drainage channel that was located between the ponds.  This design addressed the drainage concerns, replaced failing outfall pipes, and simplified the maintenance burden in perpetuity.

Construction In Progress

Seeded

Clear Creek Reclamation Project

This project has been completed

This project’s scope is to remove approximately 90,000 yards of dirt from the Clear Creek channel creating a bench just above the static water level, thus creating additional detention within the banks of the channel.  This project continues and connects with a job completed last year just upstream that commenced one quarter mile south of the Barry Rose bridge.  The previous job was approximately one quarter mile in length, the current project is approximately one half mile in length.


Masonic Lodge Ditch

This project has been completed

The Brazoria Drainage District No. 4 is scheduled to begin drainage reclamation and maintenance activities on the Willowick drainage ditch and detention system in June 2019.

Project scope shall include, but is not limited to, ditch reclamation, concrete box culvert installation, and maintenance of the drainage ditch adjacent to Willowick subdivision. Included in this work is the reclamation of the drainage easement within the Willowick subdivision for maintenance access.

The initial phase of the project shall include drainage easement reclamation work consisting of the removal of trees, debris, and any encroachments upon the drainage easement. The drainage easement has been located and marked by a professional land surveyor. The drainage easement will be cleared of any encroachment including structures, fence, plantings, and any other obstructions to the operation and maintenance of the drainage facility. Property owners with identified encroachments will receive with this correspondence an exhibit reflecting the area of encroachment that will need to be remedied.

The Masonic Lodge Ditch job is a channel improvement project to restore 2,500 feet of open ditch from the rear of the CF Spencer Masonic Lodge on Walnut St. at the north and extending south to the recently completed Fite Rd. extension.  The installation of the box culvert storm sewer beneath the Fite Rd. extension made possible the improvements that this ditch has needed for some time.  The project scope includes the regrading of approximately 2,100 linear feet of open ditch, installation of 300 feet of concrete box culvert, and the replacement of failing outfall pipes from the Willowick subdivision.

Pre-Construction through Completion

Mary’s Creek @ Independence Park

This project has been completed

Due to devastating damage from Hurricane Harvey the Brazoria Drainage District No. 4 began channel  improvements on Mary’s Creek in the Independence Park area. The first phase of improvements were from John Lizer Road to Liberty Drive near the old park entrance.

Once this section is complete work will continue on to other sections of the Creek. This project is necessary to stabilize the severely eroded banks of the channel and improve the conveyance of storm water during future flood events.

 