Appendix A

The selection of an appropriate hydrologic methodology for all projects shall be carried out in accordance with Figure 2-1.  The design engineer shall contact the appropriate reviewing agencies prior to preparing his analysis to obtain approval of the selected methodology.  This shall include a meeting with the District’s Engineer.

Attachments

Verified by ExactMetrics